After having time to review the geotechnical report, we scheduled a conference call with our architect , Jim, on January 8th. Jim talked to the geotechnical engineer and a structural engineer that he works with frequently. Based on the implications of the stability analysis, Jim had a new concept for the home which moves the footprint back away from the cliff to avoid a complicated/expensive foundation. Here is a cool sketch of the new concept that Jim sent over.An online journal documenting the planning and building process of our modern home from start to finish. It is intended to share our experiences throughout this project with all those interested in modern design.
Conference Call
After having time to review the geotechnical report, we scheduled a conference call with our architect , Jim, on January 8th. Jim talked to the geotechnical engineer and a structural engineer that he works with frequently. Based on the implications of the stability analysis, Jim had a new concept for the home which moves the footprint back away from the cliff to avoid a complicated/expensive foundation. Here is a cool sketch of the new concept that Jim sent over.
posted by
anne
on
1/08/2010
0
comments
Geotechnical Evaluation
Recommendation is to remove the topsoil, clay, and silt and to anchor the foundation into the sandstone in areas closer to 50' from the top of the slope. Looks like we can build the house, the question is what kind of foundation will be needed.
posted by
the bunny
on
12/31/2009
0
comments
Drilling
In the week leading up to the drilling, we kept checking the weather report as snow storms and bitterly cold temperatures were forecast. On December 8 and 9, the area received over a foot of snow! My Dad hired a guy to plow the dirt access road to make sure the drill rig could make it up the hill. The plowing was to take place the day before the drilling, on the tenth. I was also flying that same day, with my flight leaving on the morning of December 10. On the way to the airport, I talked to the geotechnical engineer, Jay, and he confirmed that it wasn’t too cold to drill and as long as the road was plowed, the rig should make it up the hill. I arrived at my Mom and Dad’s place at 11:45 pm. It was -9° F. When I got in the house, I discovered my Dad wasn’t there. He had gone back out to the site to help the guy plowing the road because he blew out a hydraulic line on his bobcat and his truck had gotten stuck in the hole at the very top of the hill.
Long story short, the guy worked on plowing the road from 1:30 pm to past midnight. The next morning, the drillers showed up, put on chains, and made it up the hill no problem. That was a big relief! I think my Dad was convinced the rig wouldn’t make it. It ended up being a beautiful day. It was 5-10° the next day, but fortunately there was hardly any wind. We drilled three holes along the conceptual placement of the home. Under the topsoil, there was around two feet of dark gray clay, then around two feet of dark gray silt, then around four to ten feet of orange/yellow fine grained sand, then yellow/white sandstone. Jay said the stone looked pretty strong and his preliminary assessment was as long as the clay was removed, which we would do anyway, it should be OK. I was sure happy to hear that!
posted by
anne
on
12/11/2009
0
comments
A quick but exciting peek...
posted by
joe
on
11/25/2009
0
comments
Exciting Day - meeting Jim (the architect) at our property
posted by
joe
on
10/13/2009
0
comments
Meet the Architect day
posted by
joe
on
10/10/2009
0
comments
Road Trip - California to Wisconsin to meet an architect
We just arrived driving from Riverside, CA to our property in Wisconsin. We drove here to meet with an architect in Madison, WI to possibly begin the design of our home.
Orion and Astro drove with us and they traveled really well. The majority of the way, you wouldn't even know there were two dogs with us. We drove from Riverside to Cedar City, UT on Tuesday night, then to Lincoln, NE via Denver. The drive through the Rockies was awesome - we caught it just in time to see the autumn colors at their peak and even a few inches of snow covering the tops of the mountains from the night before. We even hit a cool hail and lightning storm in the dark just as we were crossing from Colorado into Nebraska.
The rest of the drive took us through Iowa, then Minnesota, and into Wisconsin via La Crosse. From here it is 37 miles to our property - considering that I might end up working in La Crosse, it's not a bad drive. We arrived at our property just before sunset. Going up our driveway (1/2 mile from the road), the trees all around were in full autumn colors and it was like driving through a tunnel of bright golds, oranges, and reds. As you near the top, the view opens to overlook the Black River and the view was amazing! (the picture is looking east over the cliff/drop-off).
posted by
joe
on
10/09/2009
0
comments
Map Info - finally...
Here is the third map. This is an isometric 3D
posted by
anne
on
9/26/2009
0
comments
Bought and Surveyed a 14 acre wooded parcel in Wisconsin - its AWESOME!!
Finally getting time to update the blog with our recent progress. Although it took a little longer than expected, we finally closed on the 14 acre piece of property in Wisconsin. It is located about 6 miles outside the town of Black River Falls. It is a beautiful vacant lot with a half-mile dirt road leading from the paved road below to the top of a 150ft tall cliff with clear views of the entire eastern horizon overlooking the Black River valley.
Here is a map of where our property is. View the larger map and zoom all the way in to see a rough property line and the place where we are going to site the home.
View Hwy 54 Property in a larger map
posted by
joe
on
8/23/2009
0
comments
A new home site? - let's hope so...

Anne spent several months searching for property listing and Google Earth for vacant land with some terrain and rolling hills. She really did put a lot of work into it and it finally paid off.
There is very little building below it (except for a house just at the bottom of the cliff and out of view) and the Black River is visible just to the east of the property. Pretty much everything in view east of the river is county forest land so will never be built on.
There already is a dirt road in good condition going to the top which will make construction much easier and the big flat area at the top is more than enough to build a home on. Since it is unincorporated, we won't have any village board to deal with and since there is river/lake/creek on the property, the DNR won't be involved either wo-hoo!!.
We put an offer in on the property, are in escrow now, and set to close on June 12th if all goes well. Overall, this is an awesome site and we are excited to finally start making some progress again!
posted by
joe
on
5/25/2009
0
comments
The Mill - R.I.P. 1860 something to 2009 - now a big unsightly hole and hazard...
After some stones from the south wall of the Mill building foundation fell out and into the creek, the DNR decided to issue a "draw down" order to the Village for the lake behind the dam. They claimed it was a "high hazard" dam and the the stones falling out of the foundation of the building compromised the dam's safety. The funny thing is that just 12 miles away, there is a real dam with a hydroelectric plant, a big lake behind it, and substantial infrastructure below the dam. This dam actually is crumbling and needs to be repaired or removed (something being worked out by Jackson County and Black River Falls). The last time there was a major flood in 1993, a large part of the city was flooded damaging more than 100 homes (source here). Funny, this dam is rated as "low hazard". Compare this the the Merrillan dam which at most has around 10 acres of water in it and maybe 8 feet deep at the deepest part. Also, there are no homes/buildings in the flood plain area down river. Why would this dam be considered high hazard?
Regardless, the Village Board was upset at the lake being drawn down which became even more of an eyesore. They didn't want to work with us to try to improve the situation and instead decided to try to first issue a "raze order" and then try to eminent domain the property from us. Amusingly, they really couldn't decide what to do, because at various times they were trying to eminent domain it from us and at others, they claimed that we really weren't the owners and the original sale to the first private owner was "illegal". Really, they had no basis for the eminent domain since having a lake isn't really a public necessity.
We finally got tired of all of the trips and paperwork (and costs) to keep fighting and ended up selling the property to the Village in Jan 09. Which immediately afterward, they hired some local Amish people to tear down the wooden part of the Mill structure. The funny thing is, we can't figure out why they were so quick to tear down the wood since it really didn't accomplish anything.
The DNR still won't lift the draw down order since nothing was done to address the "safety" concern and it is going to cost a lot of money to remove the foundation and engineer fill the site to a condition the DNR finds suitable something the Village really can't afford. We could have (on the other hand) afforded it, and would have added a beautiful structure to replace the delapidated Mill and also would have added quite a bit in property taxes to the Village's tax base in the process.
In the end, no one benefited since the lake is still down, it is going to cost a bundle to fix it, and now there is a big, ugly, open hole in the ground next to the dam. So much for the public safety claims since the Village now does own the property (WITH A BIG OPEN HOLE) and has made no attempt to fence it in, or prevent someone from falling in to it (check out the video below).
posted by
joe
on
5/25/2009
0
comments
the DNR couldn’t wait
Hi everyone. I have been remiss in maintaining our blog. After the December Board of Appeals hearing, I was pretty upset and had a hard time getting going again on the project planning. In some respects, it seemed hopeless and hard to deal with being so far away. I’ve spent some time today in updating the blog to fill in the blanks on what has happened since December. Hopefully, the project can get some traction now and make forward progress.
Over the last month, I have been working with the attorney to respond to the DNR to address their concerns with the building project. We were just about to approach them to go over the issues.
While driving around today, I noticed a new e-mail that popped up on my iPhone. It was a message from my sister, Karen. She had sent a .pdf of a letter that the DNR sent to the Village and our family regarding the mill wall failure. We (our family and the Village) have been informed that the DNR has been notified of the mill wall failure, has inspected the situation, and wants to know what we are going to do to rectify the situation. So, we will be getting back to the DNR next week, with the information we have already prepared. Hopefully, we can work cooperatively with the Village to respond. We have a simple solution – allow the building project and all the problems are solved! Stay tuned;-)
posted by
anne
on
4/18/2008
1 comments
The Building Couldn’t Wait
So, my Dad called today. He left a voice mail message. He never hardly calls, and if he does, he doesn't leave voice mail messages. Not only is this a rarity, the message was 1 minute, 46 seconds long! When I saw that, I knew something was strange…I listened to his message to find that a portion of the south wall of the mill building had fallen into the creek. Granted, it was old, but since the Village was working on the
posted by
anne
on
4/04/2008
0
comments
Let Me Run That by my Attorney…
So I finally did it. I never thought in my life I would have a real need to ever hire an attorney, but I do now! In addition to researching the Wisconsin State regulations to learn them for myself, I searched the internet for hours (from California) and asked for references from anyone I could think of to find an attorney in Wisconsin that specializes in land use, zoning, and municipal law. I figured if we were going to spend the money, we might as well go big and hire the best firm we could find. After talking to a few of the best around, we landed on a team of three attorneys from DeWitt, Ross, and Stevens. They came recommended by the architect we like.
After talking with them, they confirmed what I was afraid of – if a judge heard the case, we would more than likely win, but all that would come of it is the judge ordering another hearing on the same issues, with the same Board of Appeals. The BOA members would still not be able to read a map or understand their Ordinances. If heard a second time, the BOA would have an attorney on hand, actually hold the meeting correctly, and come up with “valid” reasons for denying the variations. Unfortunately, we would be out a lot of cash and be right back were we started. The attorneys we hired had an alternative proposed game plan that we work with the DNR first, then go to the Village (if the DNR can work out an acceptable project with us). That sounded good to us, so we signed the agreement and sent in the retainer today.
posted by
anne
on
2/21/2008
0
comments
official denial
Today, the BOA finalized their official denial letter. During the December 18th appeal hearing, the BOA was advised they could consult with an attorney prior to making their decision, but they elected not to do so and made their decision right then, during the meeting. It is interesting that many of the reasons cited in the denial were not brought up in the appeal hearing. I was wondering how an attorney hired after the fact could come up with valid reasons for denial if they weren’t brought up at the meeting.
In accordance with the Village Ordinance, the decision was to be filed immediately. The BOA elected to hold off on the official denial until they got it done with the attorney. The Ordinance states we would have 30 days from the decision to file an appeal with a Court of Record, if we believed the decision was not in order, but the Clerk said we would have 30 days from the date of the official denial to move forward with an appeal to a Court of Record. I’m sure that we would win, if a judge heard the case, and are gathering information to take the next step.
posted by
anne
on
1/14/2008
0
comments
Got the BOA Meeting Minutes
The meeting minutes were finally done today. I have been asking for all kinds of information from the Village to see if it can help my case. The minutes are all over the place and some of the facts are off (and some are missing), but they are done, nonetheless. They can be found here, if you are interested.
posted by
anne
on
1/03/2008
0
comments
We Made The Front Page Again!
The reporter from the local paper, the Banner Journal, attended the BOA appeals hearing and wrote up an article for the paper. Unfortunately, the way the meeting went can not be conveyed in an article like that. I just hope that going forward, we can help educate everyone on the facts of the project and get it ultimately approved. At this time, we are looking for attorneys to give us advice on how to proceed. The next step, per the Village Ordinance, is to take the decision to a Court of Record for a review.
posted by
anne
on
1/02/2008
0
comments
Board of Appeals Hearing
The Board of Appeals (BOA) meeting was held today to see if a zoning permit would be issued. There were five variances requested by us:
1) to be within 20' feet of the south property line
2) to be within 10' feet of the west property line
3) to be within 50' of the centerline of the road or 17' from the right of way
4) to construct with a flat roof
5) to construct without overhanging eaves
I gave a PowerPoint presentation, similar to the last one I gave, only this time I concentrated on the reasons I was requesting the variations, and gave a list of community benefits including: strengthens dam embankment and foundation, provides example of green building techniques and construction/design methods, may improve utilities, improves the beauty of the area by replacing the deteriorating building with a beautiful structure, observatory will provide an educational resource for local schools, and continued use of property for residents to enjoy.
To make a long story short, the BOA members were not able to read and/or understand the maps that I had prepared for the project, the Department of Natural Resources threatened to sue the Village, and two of the BOA members didn’t like the idea of the project at all. Highlights include:
1) One of the BOA members was convinced we didn’t even own the property, even though an independent surveyor (hired by the Village) spoke and confirmed that we did!
2) Another BOA was concerned that our sewer connection would require disturbance of previously undisturbed earth. No matter how many ways I tried to explain that the sewer lines would run in the street/right of way in already disturbed areas, just like everyone else’s, he didn’t get it.
3) Two BOA members keep thinking the existing building was south and west of its real position. The Clerk provided the BOA members with an incorrect map of the area, prepared by the County for their GIS mapping project. Each time I explained it with all available maps including aerial photos, they kept forgetting and making references to the wrong location. During one exchange, after being told that the location of the mill building, “was most certainly not!” in the location I said it was in, one of the BOA members finally got it for a fleeting moment and said, “By golly, Annie, I think you’re right.”
4) They kept saying the property was zoned Conservancy, but it is really zoned both Residential and Conservancy, and the entire project would be considered Residential pursuant to the Village Ordinance. Because they couldn’t read a map correctly, they kept getting this point wrong.
5) The
6) The DNR had a letter read into the record, told the Village they would have to remove the dam if they allowed the project to move forward, said that they don’t want to “force the DNR’s hand” and make them sue the Village for not enforcing their zoning ordinance and finally said, “It is OK to vote no.”
7) Of course, our friendly neighbor, “Swede” was there, speaking out against the project.
On the good side, a few of the neighbors came and spoke in support of the project. But that didn’t matter. After the BOA heard that the DNR would potentially sue them and make them take out the dam, they didn’t really want or need to hear anything else. Without even questioning if the DNR even had the jurisdiction to do anything they were threatening to do, and without giving consideration for each of the variations individually and the reasons for them, in the end, the BOA members voted NO on the “project”.
They didn’t give any reasons until I pressed them for reasons. The most vocal BOA member said beauty is in the eye of the beholder and with a flat roof, four sides – that's a trailer, a crackerbox, and we don't want a trailer there (the existing building has a flat roof on half of they building). Also, there were too many variances all at once and just because someone thinks they can build a house somewhere doesn't mean they can. He also mentioned it is zoned Conservancy (it isn’t!), that there is no yard (there is more yard than most residential properties in town!), and we would have to go on private property to wash our windows (the property borders Public property, not Private!). It was too late for me to address these issues, and he hadn't asked about these concerns he had during the public hearing to make an educated decision.
One of the other BOA members said that she liked the building just the way it was (as if it was the Village’s building and a Village project), and didn’t want it to change. I said I didn’t hear any reasons pertaining to the three part test they were supposed to apply to grant or deny the variations and the Clerk said she’d come up with something out to it.
After the meeting, they decided to hire an attorney to draft a response. The meeting was not conducted like a typical public meeting – there were no rules of order observed and even though it went on for over two hours, it went by in a flash. I wanted to say so much and have them understand so they could make an educated decision, but I wasn’t able to get the message across.
posted by
anne
on
12/18/2007
1 comments
Presentation to the Village Board
We both will be back in Wisconsin in mid-December to give another presentation to the Village Zoning Board of Appeals to who will decide on the fate of the variances that we will need to move forward. Here are the before and after mock-ups that I made for the presentation.
posted by
joe
on
11/20/2007
0
comments
Pissin off the neighbors (well, only one)
His first letter to the editor: http://tinyurl.com/3dh57s
His second letter to the editor: http://tinyurl.com/2bqu6u
posted by
joe
on
10/31/2007
0
comments
a fun wedding and serious research

On lucky 7-7-7, we made another trip back for Anne’s sister, Kathy’s wedding. The trip was a great chance to get some great pictures of the dam and mill building while the water on the lake is still down. You can see the two “plugs” on the dam – one is a three foot culvert running under the dam on the north side, the other is a concrete "box", approximately foot feet by six feet in area. During this trip, we had a great time, enjoying the weather (it actually rained!) and family, making the idea of moving back to the Midwest more real than ever.
Since that trip, we have gotten serious with preliminary planning for the project. We’ve got a copy of the Village’s ordinances, along with the appropriate Zoning and Variance applications for our project. We also have the as-built locations for water and sewer in the vicinity of the site. Both sets of survey data, along with the water and sewer information, have helped to develop a better site map (here). Anne has been busy researching and doing her own hydrology studies for the region. Anne’s sister, Karen, was also able to find some cool, old blueprints from the last time work was done on the dam in 1975 through the local engineering firm she works for. Soon we will be making our first submittals to get the project permitted – stay tuned!
posted by
anne
on
7/14/2007
0
comments
Good-bye San Diego! More forward progress…
posted by
anne
on
7/03/2007
0
comments
Surveying: The perfect family bonding experience
In March 2007, I took a trip home without Joe and decided to do some more surveying to pick up on details in the area. Since the November 2005 survey, the Village installed a new culvert and rock outlet, and the brush clearing revealed more terrain that wasn’t as easily accessible the first time around. Anne’s sister is also a Civil Engineer and they had fun surveying with modern equipment w/ built in GPS. My other sister, Kathy, a schoolteacher, even got in on the fun, holding tree branches out of the way so Anne and Karen could get some hard to get shots. The weather was great, so the whole family - Mom and Dad, and the cutest nephew in the world, Karen’s son (Michael), and Karen’s husband (Darrick) stopped by to hang out while the surveying went on.The Oakwood Lake Revitalization Project is still ongoing. The plug is still “pulled,” so the lake is down. While I was home, an intense storm happened, and the lake filled up temporarily, taking her parent’s boat dock from it’s location about a ¼ mile upstream, and floating it down to the dam. My Dad and brother ended up getting it back home, eventually.
posted by
anne
on
4/03/2007
0
comments
There Goes the Waterfall!
2006, the stars aligned, all permits were issued, and a public works project to remove approximately 29,000 cubic yards of material was let. The project involves “pulling the plug” on the dam and draining the upper pond before the winter, with removal activities happening during the winter months after the bottom of the pond had a chance to dry up and freeze up a bit. Also included are installation of a handicapped fishing pier and non-motorized boat ramp. The project was awarded to Hoffman Construction in January 2007. The pond was drained in January 2007 and a majority of the excavation work was completed in February 2007.
posted by
anne
on
3/03/2007
0
comments
lots of brush to clear
Went to Merrillan for the Labor Day Lions Club festival. While we were there we spent 4 days
We also tried to shore up the roof which has started to sag in partly due to the foundation starting to collapse partially due to a vertical crack. If this winter brings a heavy enough snow, the South side of the building might just collapse.
posted by
anne
on
9/12/2006
1 comments
Met a great architect
After Jim showed us some of his previous work and told us about the firm, we showed him the topo of the site layout. His first reaction was "Are you sure that you will be able to fit a house here within the set backs from the road and water?" (Remember, the site is oddly shaped and there isn't much buildable space outside the footprint of the existing building.) Then we showed him pictures of the site. He almost started drooling immediately - "We have got to build a house here! What an unbelievable location!" he said. "We can make it work, we've gotta make it work." "I don't mean to presume that your going to choose me to do the design, but wow what a great site!"
He was very excited and started showing us ideas of what what he generally thought would work and asking us what materials we liked. It was great, because this is the exact reaction we wanted to see from the architect we would choose. We were looking for someone who would instantly see what a special location this was and not just do the design because we were paying, but rather to really feel passionate about it.
After a couple hours of discussing ideas Jim asked us if we wanted to go to a nearby project that he just completed. It was lunch time so he offered us some brats that they were barbecuing out back. He came back in the conference room with three brats on a paper plate, a bag of buns, and a couple bags of chips. I think that this sealed the deal for Anne! We ate, and then went to the site that he had just completed.
The home was beautiful - situated on a hill, sloping down to a lake with a great view of the state capital. The design was very similar to what we were looking for, eye pleasing rectangular shape (no curved walls), very open floor plan and no formal dining room. It was a mix of concrete, stucco, corrugated metal, and lots of windows.
Overall, we were very pleased with our experience. What more could you ask for, someone who was relatively close to the site, designed in the style we liked, and was super excited about the project.
posted by
anne
on
8/11/2006
0
comments
The long beginning...
More to come!